Features:
- For applications in mobile machines and harsh industrial environments
- Wide operating temperature range and high protection rating
- Vibration and shock resistant thanks to coupling ring with locking mechanism
- Resisting fast temperature fluctuations and salt spray
- Resistant to oils and coolants
For more information, please see Data Sheet
Diagrams and graphs | | Derating Imax * 0.8 DIN EN 60512-5-2 | | X | Ambient temperature [°C] | | Y | Current [A] |
|