Tripp-Lite PDU3MV6L2120LV 5.7kW 3-Phase Local Metered PDU, 120V Outlets (42 5-15/20R), 208V L21-20P input, 6 ft. (1.83 m) Cord, 0U Vertical, TAA

Tripp-Lite PDU3MV6L2120LV 5.7kW 3-Phase Local Metered PDU, 120V Outlets (42 5-15/20R), 208V L21-20P input, 6 ft. (1.83 m) Cord, 0U Vertical, TAA
Click to zoom
  • Specification
  • Overview
  • Customers Also Bought
  • Your Recently Viewed Items
  • Reviews
Condition: new
Warranty
  • $825.75
    • $572.00 / Each
      You save30.73%
Contact Us

Overview


Highlights

  • Local Metered 5.7kW 3 Phase 120V output PDU; 70 in. / 178cm 0U vertical rackmount
  • Reports load level per-phase via built in current meters
  • NEMA L21-20P (3P+N+E) 208V 3 phase input; 6-ft. (1.83 m) line cord
  • 42 NEMA 5-15/20R outlets (120V), Toolless button-mount installation; cord retention brackets included
  • Compliant with the Federal Trade Agreements Act (TAA) for GSA Schedule purchases

Features

  • 5.7kW 3 phase 120V output Local Metered Power Distribution Unit / rack PDU (rPDU)
  • Set of 3 built-in current meters continuously report load current per phase
  • Attached NEMA L21-20P 20A (3P+N+E) 208V 3 phase input plug with 6 ft. / 1.8m cord
  • 0U, 70 in. / 178cm vertical form factor supports installation in 2 or 4 post equipment racks
  • 42 total outlets arranged in three single phase output load banks
  • NEMA 5-15/20R outlets output 120V
  • Included cord retention brackets keep vital network equipment plugged in and continuously powered
  • Toolless mounting supported in button-mount compatible racks, plus nut-and-bolt mounting brackets for other mounting applications (set of 2 9mm buttons pre-installed, 2 9mm and 4 6mm spare buttons included)
  • Compliant with the Federal Trade Agreements Act (TAA) for GSA Schedule purchases

Package Includes

  • Local Metered Rackmount PDU with pre-installed mounting buttons
  • Cord retention brackets
  • Spare installation buttons (2 9mm / 4 6mm)
  • Rack mounting brackets
  • Owner's manual

Reviews